BlueCrow Send your first job

We find the money in your drawings.

We do takeoffs from your plan sets, change orders, submittals and billing schedules, each checked item by item by an experienced electrical project manager, and your first job is free.

A dollar a fixture. $150 minimum. Your first job is free.

Send your first job See a real sample

No sign-up. Every job total is quoted in writing before we start.

Part of lighting plan EL 210 with every fixture circled in a color for its type. Two track runs along a wall are labeled 24.1 LF and 24.2 LF.
EL 210 Track measured run by run: 24.1 + 24.2 LF. Every fixture is ringed by type. From the public sample below.

What we do

We start with electrical subcontractors. Three offers, from the bid through the build, each with its price up front.

For a job you're bidding

Bid Pack

The count. Every fixture, control device and linear run is ringed on the drawings and counted twice, separately. Then an experienced electrical project manager checks every ring, multiplier and linear run, item by item on the drawings.

$1 per item, $150 minimum. The top 3 notes that change your price are included, free.

The Scope Review. Every scope gap, the questions to send the designers before bid day, and a one-page job brief.

$100 flat.

Before your bid date, you get:

  • the ringed sheets, as a PDF
  • counts by type and sheet, in a spreadsheet
  • the top 3 notes that change your price, each with its sheet
  • with the Scope Review: every scope gap, the questions for the designers and a one-page job brief
See a real sample

For a job you're building

Submittal Pack

Product data for what the spec asks for, put in order by spec section with a cover sheet, ready for you to review and send.

$300 per package.

Change Order Desk

Your bid set compared with the new set. Every change listed with its sheet, and draft change orders ready to send.

$250 per comparison, and free if we find nothing you can bill.

Need it in under 2 working days? That's a rush, at half again the price. Billing schedules, receptacles, power, feeders and anything else not listed here get their own written quote first.

How it works

  1. Send the job

    Email the plan set, specs and addenda, or just the job name if it's a public bid. Tell us what you need and when you need it. The clock starts when we have the complete drawings and specs.

  2. Get the price first

    Your first job is free. After that, you get the job total and a delivery date in writing before we start, like "about 240 items, so $240."

  3. Get it checked, on time

    Every item is counted twice, separately, and an experienced electrical project manager checks the work item by item. On a paid job, you see the totals marked DRAFT, pay by card or bank, and get the files by the date we quoted.

Your first job is free

One per company, on a job you're actually bidding, up to 300 items. On a bigger job, the first 300 items are free and the rest are $1 each. Nothing to sign up for, and no obligation to buy. We're new, and a real job is the best way to show you the work.

After that, it's a dollar an item (a fixture, a control device or a linear run), $150 minimum, and we quote the job total in writing before we start.

Send your first job

A real sample: Ashman Library lighting upgrade

From public bid documents: City of Madison, Wisconsin, contract 8960. Five sheets dated 2/9/2021, counted from the drawings the city posted for bidding.

  • 205 fixtures in 18 types
  • 48.3 LF of track in 2 runs
  • 68 control devices in 8 types
  • 2 questions worth an RFI before ordering

Two catches

Two "2x2" types carry a 2x4 catalog number

The schedule describes types 22R-2000 (6 fixtures) and 22S-2000 (3) as "Recessed 2x2" and "Surface 2x2", but both catalog numbers start EPANL-2x4. That's nine fixtures that could be ordered in the wrong size, so it's worth an RFI before release. EL 300, Lighting Fixture Schedule

A straight text count would overcount

Sections 2 and 3 on EL 210 repeat 8 plan tags, and sheet CR 100, the light-level and emergency lighting study, carries 23 more fixture tags. Neither is extra work, so both are set aside, and the plan count then matches the fixture schedule for every type. EL 210 details 2 and 3, CR 100

Close-up of the click-to-check page. Surface 2x2 fixtures are circled. A clicked motion sensor shows a box reading MW, Counted, Motion Sensor wide Range, with buttons to delete it or stop counting it.
How each count gets checked: click any ring to see what it was counted as, and fix it if it's wrong.

Fixture counts

Show all 18 types, checked against the fixture schedule
Counted on sheet EL 210. "Match" means the plan count equals the count on the fixture schedule (EL 300).
TypeSchedule descriptionCountCheck
22R-2000Recessed 2x26RFI: size
22R-3400Recessed 2x298Match
22R-4000Recessed 2x29Match
22R-4800Recessed 2x24Match
22S-2000Surface 2x23RFI: size
22S-3400Surface 2x224Match
22S-4000Surface 2x23Match
24R-4000Recessed 2x416Match
P-UD-4500-08Pendant linear, 80% down, white16Match
S2-2500Striplight 2'2Match
S3-3750Striplight 3'1Match
S4-5000Striplight 4'5Match
S8-6000Striplight 8'3Match
SR-10-2200-WSurface round, white2Match
T-FL-1500Track head, 38°3Match
T-NFL-1500Track head, 23°3Match
T-SP-1500Track head, 10°3Match
EX-ACExit sign, AC4Match
Fixtures18 types205
TRACKTrack for the scheduled heads, measured48.3 LF2 runs

Control devices (68): 23 dual-technology wide-range motion sensors, 14 wide-range, 6 short-range, 4 high-bay and 1 corner-mount motion sensor, 15 dimmer switches, 4 single-pole switches and 1 four-circuit programmable clock.

From the notes and specs

Four of the eleven items on this job's checklist:

  • The library stays open. Work in sections with no complete outages, so price the phasing. G 001 B.1, I.1
  • Work hours are 6 a.m. to 5 p.m., Monday to Friday, unless approved. G 001 B.5
  • UL 924 relays are triggered by the existing fire alarm panel. Is a dry contact available, or does it need a relay? G 001 B.2, EL 210 KN 13-14
  • Three ceiling fans and a fan speed control sit on the lighting sheets under a mechanical spec. Who furnishes and wires them? EL 300 fan schedule, EL 210 KN 3

Open the full sample (PDF, 2 pages)

Prepared from public bid documents posted by the City of Madison, Wisconsin, for illustration only. Counts leave out section views and the light-level study, which repeat plan tags. Verify all quantities before bidding.

Questions

Who checks the work?

Every item is counted twice, separately, then checked item by item on the drawings by an experienced electrical project manager. The check covers every multiplier and linear run, and everything else we send gets the same check before it goes out.

What if you miss something?

Every item is marked on the drawings, so you can check any count in minutes. Find a confirmed miss and that job is free: we correct it and refund that job's fee.

A confirmed miss is an item inside the agreed scope that the count left out or got wrong, reported within 7 days with the sheet and the spot, and checked on the drawings. The refund covers our fee for that job, never your bid or your losses.

What do you need from us?

  • Bid Pack: the PDF drawing set, the specs and every addendum, or just the job name if it's a public bid.
  • Submittal Pack: the spec sections and the products you plan to use.
  • Change Order Desk: the bid set and the new set.
  • Billing schedule: your contract amount and your general contractor's format.

PDFs exported from design software work best. A scanned or hard-to-read set gets a higher quote or a polite no, and we'll tell you which before we start.

How fast is it?

A count takes four working days by default, or two working days on a public job we've already counted, and you get a written delivery date before we start. The clock starts when the complete drawings and specs arrive. Submittal Pack and Change Order Desk jobs get a date with the quote.

Need it in under 2 working days? That's a rush, at half again the price. Drawings that arrive less than a day before your bid get a polite no.

How do we pay?

By card or bank, through a secure Stripe link, with a receipt. Never a wire transfer. Paid work is paid before the files go out, and before you pay, you see the totals page marked DRAFT.

Are our drawings kept private?

Yes. Your drawings are processed with secure cloud software, used only for your job, and deleted 30 days after the bid. If you want them kept longer, just ask. A job you send us is never counted for other shops or used in our marketing, and we never tell anyone which shops are bidding a job. One thing to know: on public jobs we pick ourselves, any shop that may bid can get the same count. We don't sell exclusives.

Send your first job

Email is the best way to reach us. Tell us the job name and your date, or attach the drawings.

gio@bluecrowhq.com

Phone (484) 275-5155

Web bluecrowhq.com